BTBeslan Tsys
Open to projects

Beslan Tsys

Presales Architect · Data Center & AI

Server platforms, storage and backup, SAN, virtualisation and GPU clusters. End-to-end technical ownership: discovery, sizing, tender documentation, architecture defence and commissioning.

Beslan Tsys
Data center & AI infrastructure
Years in infrastructure
7+
Projects delivered
100+
Certifications
34
Vendors
8

01

About

For more than 7 years I have worked in IT infrastructure — from running servers and networks to architecting solutions for data centers and artificial intelligence.

I started in hands-on operations: servers, backup systems, data networks and incident response. That background still shapes how I work: every design is judged from the point of view of the people who will deploy and run it.

Today I specialise in presales and infrastructure architecture. I turn a business requirement into a justified design: discovery, workload-based sizing, comparison of vendor platforms, bills of materials, technical and tender specifications, and defence of the solution before the customer’s engineers and executives.

A dedicated focus is AI infrastructure: GPU servers and clusters for LLM inference and training, sizing for local language models, InfiniBand fabrics and IBM Power platforms.

More than 100 projects across Kyrgyzstan, Uzbekistan, Kazakhstan and beyond, from small businesses to large enterprise and public-sector customers. My expertise is backed by 34 certifications from eight vendors.

years in IT infrastructure
7+
projects delivered
100+
certifications
34
countries
4

How I work

01

Verified numbers

Every value in a specification is backed by vendor documentation and a calculation for the real workload.

02

Vendor neutrality

I compare solutions from different vendors and recommend what fits the task and the budget.

03

Ownership to go-live

I stay with the solution from the first meeting through commissioning and handover.

02

What I do

8 domains · 34 certifications

Eight infrastructure domains, each with skills drawn from the syllabi of my certifications and a case from practice: the challenge, the architecture, delivery and the outcome.

01 · STOR06 certs

Storage systems

Architecture of block, file and object storage for critical workloads: array class, protection and replication levels, sizing for the real I/O profile.

  • All-flash, hybrid and unified arrays: active-active controllers, NVMe and NVMe-oF, write-cache protection
  • Protection levels: RAID, distributed RAID and erasure coding; rebuild time and reliability for high-capacity drives
  • Inline compression and deduplication, thin provisioning, usable and effective capacity
  • Synchronous and asynchronous replication, active-active metro clusters with a witness, consistency groups
  • Snapshots, immutable copies against ransomware, non-disruptive migration between arrays
  • The full storage lifecycle: planning and design, deployment, operations, performance tuning and troubleshooting
  • Access protocols: FC, iSCSI, NVMe/TCP, NFS, SMB, S3; software-defined and distributed storage
  • Workload-based sizing: IOPS, latency, throughput, working set and cache size

Backed by certifications

  • Huawei · HCIP-Storage
  • Dell · Technology Architect, Midrange Storage Solutions
  • Dell · Information Storage and Management
  • IBM · FlashSystem Technical Sales Intermediate
  • IBM · FlashSystem Sales Foundation
  • Huawei · HCSA-Presales-Storage
CaseStorage metro cluster across two sites
Challenge
Keep databases and the virtualisation cluster running through the complete loss of either of two server rooms 2 km apart. Requirements: block and file access, RPO = 0, automatic failover. The customer had planned an entry-level array.
Architecture
Two all-flash arrays running active-active with synchronous replication over dedicated fibre; a witness at a third site to prevent split-brain; stretched volumes and file systems; ALUA multipathing preferring local paths. The higher-tier model was justified by cache capacity for synchronous writes and performance headroom.
Delivery
Test programme; deployment of the metro pairs and witness, zoning of both FC fabrics, host multipathing; integration with vSphere Metro Storage Cluster: VM placement rules, HA responses to APD and PDL. Failure tests: an array, the inter-site link and a whole site.
Outcome
Every test scenario passed: when a site fails, services carry on at the other one with no data loss and no manual action, and synchronous write latency stays within database limits. The solution went into production.
02 · FC-SAN07 certs

SAN and Fibre Channel

Design and operation of Fibre Channel storage networks: resilient topology, zoning, non-disruptive upgrades and fabric health monitoring.

  • Dual-fabric SAN: core-edge and collapsed-core topologies, oversubscription and port capacity planning
  • Fabric services: Name Server, RSCN, WWN, FCID, Domain ID, principal switch selection, fabric merges
  • FSPF routing, traffic balancing, ISL trunking
  • Single-initiator zoning, aliases and zone configuration management
  • Multipathing (ALUA, MPIO) and path resilience testing
  • Non-disruptive upgrades of 32G/64G switches and directors, firmware management
  • Monitoring and diagnostics: threshold policies, port congestion, configuration drift, optical link diagnostics

Backed by certifications

  • Brocade Certified Fabric Administrator
  • FCSAN-101 · Introduction to Fibre Channel SANs
  • HWG7D-121 · Gen 7 Director Hardware
  • HWG7S-122 · Gen 7 Switch Hardware
  • HWX6G7-120 · Upgrading X6 Director to Gen 7
  • MPOV-120 · SANnav Management Portal
  • WEBT-121 · Fabric OS Web Tools
CaseDual-fabric SAN for a server estate
Challenge
Commission an estate of 17 servers, two storage arrays, a tape library and four FC switches without affecting live services and under strict security requirements.
Architecture
Two physically independent 32G fabrics of two switches each with ISL trunking; two HBAs per server and a storage controller in each fabric; single-initiator zoning on aliases with dedicated tape zones; 25GbE server network with LACP.
Delivery
Test programme and a plan aligned to maintenance windows; servers, HBAs and switches brought to one compatibility matrix; fabrics built and zoning loaded; optical link diagnostics; multipathing configured and paths verified by taking each fabric down in turn; threshold monitoring on ports. Vendor telemetry disabled at the security team’s request.
Outcome
The estate went live within maintenance windows with zero downtime for running services. Losing any fabric, switch or HBA does not interrupt data access, as the tests proved. The customer received as-built documentation with diagrams and configurations.
03 · BKP04 certs

Backup and data protection

Ransomware-resilient backup and recovery, long-term retention and disaster recovery.

  • Backup architectures: 3-2-1 rule, D2D2T, isolated and immutable copies
  • Source and target deduplication; purpose-built backup protocols: DD Boost/OST, VTL, NDMP
  • Integration with Veeam, NetBackup, NetWorker, Commvault and Oracle RMAN; backup from storage snapshots
  • RPO and RTO, backup windows, GFS policies and repository capacity
  • S3 object storage for archive and long-term retention, geo-replication
  • Disaster and cyber recovery: recovery plans and regular testing
  • Database protection: activity monitoring, access control, audit reporting

Backed by certifications

  • Dell · Implementation Engineer, PowerProtect DD
  • Dell · Data Protection and Management
  • Dell · Implementation Engineer, ECS
  • IBM · Guardium Data Protection Practitioner Advanced
CaseD2D2T backup system at 384 TB
Challenge
Build backup for the virtual estate and databases with disk and tape tiers, an isolated copy and room to grow without replacing hardware.
Architecture
3-2-1 design: a disk array with an expansion shelf (20× 24 TB NL-SAS, SSD read cache), two 192 TB RAID 6 (8+2) pools, 10GbE iSCSI and a Veeam scale-out repository; an LTO-8 tape library for long-term and offline copies. Two pools justified by write parallelism, controller load and 24 TB drive rebuild time.
Delivery
Backup servers and proxies deployed, backups taken from primary-array snapshots to spare production; jobs and GFS policies, immutable copies; recovery tests per the programme: full VM restore, instant VM recovery, database object restore and restore from tape.
Outcome
Full backups fit the overnight window and critical VMs restore within the target RTO. The tape copy keeps an air-gapped instance of the data in case of ransomware. The design scales to 1.6 PB by adding shelves.
04 · HCI05 certs

Virtualisation and hyperconvergence

Design and delivery of virtualisation platforms and hyperconverged clusters: from sizing and network design to lifecycle and resilience.

  • vSphere 8 clusters: HA, DRS, vMotion and Storage vMotion, distributed switches, lifecycle management
  • vSAN OSA and ESA: storage design, storage policies, erasure coding, fault domains
  • Stretched and two-node clusters, witness nodes, inter-site network requirements
  • HCI network design: traffic separation, NIOC, jumbo frames, 25/100GbE
  • Hyperconverged platforms: deployment, network validation, upgrades and scale-out
  • Alternative stacks: Nutanix AHV, Proxmox VE + Ceph, zVirt + GlusterFS
  • Cluster sizing for vCPU, memory and capacity with failure tolerance and growth

Backed by certifications

  • VMware · vSphere: Install, Configure, Manage [V8]
  • VMware · vSAN: Plan and Deploy [V7]
  • VMware · VSP Foundation 2022
  • Dell · Implementation Engineer, VxRail
  • Dell · VxRail Deploy
CasevSAN ESA cluster on 16 nodes
Challenge
Build a virtualisation platform on 16 all-NVMe nodes with 153.6 TB each for critical workloads. The original specification came in Intel and AMD variants.
Architecture
A specification audit against vSAN ESA requirements found bottlenecks: 25GbE too slow for storage traffic, unbalanced memory on AMD, a Power Saving BIOS profile and no TPM for encryption. Final design: 2× 100GbE for vSAN and 4× 25GbE for VMs, vMotion and management; a distributed switch with NIOC; rack-level fault domains; RAID-6 policies tolerating two failures for critical VMs; data-at-rest encryption with keys in TPM.
Delivery
Component compatibility checks, firmware and drivers aligned to vSAN requirements; cluster deployed from a single image with Lifecycle Manager; distributed switch, NIOC and jumbo frames; fault domains and storage policies; load testing and failure tests of a node, a drive and a network link.
Outcome
Bottlenecks were fixed before delivery, with no rework on site. The cluster passed load and failure testing: losing a node, a drive or a link does not stop VMs. The platform went into operation with a documented update process.
05 · AI/HPC04 certs

AI infrastructure and HPC

Compute platforms for language model inference and training, RAG systems, video analytics and HPC in closed environments.

  • Local LLM sizing: memory for weights, KV cache, context length and concurrent users; FP8, INT4 and AWQ quantisation
  • Accelerator and platform choice: NVIDIA H200, B300, RTX PRO 6000, L40S, L4; NVLink, NVSwitch and PCIe topologies
  • Fabrics for GPU clusters and HPC: InfiniBand and RoCE, non-blocking topologies
  • Inference stack: vLLM, tensor parallelism, continuous batching; tokens-per-second and time-to-first-token metrics
  • RAG and agent systems: embeddings, rerankers, vector databases, integration with enterprise data
  • AI platforms: IBM watsonx, Nutanix Enterprise AI; AI workloads on IBM Power
  • Power and cooling for high-density GPU servers

Backed by certifications

  • IBM · AI-Enabled Infrastructure Practitioner Advanced
  • IBM · AI on Power Intermediate
  • IBM · watsonx: Technical Essentials
  • NVIDIA · InfiniBand Essentials
CaseGPU platform for local LLMs
Challenge
Inference for a model set in an air-gapped environment: Qwen3-235B-A22B (AWQ), Qwen2.5-VL-72B, Qwen3-14B (FP8), embeddings, a reranker, OCR and speech recognition for an enterprise assistant.
Architecture
GPU memory sized for weights, KV cache and the target user count. The original specs mixed accelerator generations in one server, which the vendor confirmed causes driver and BIOS issues. Final platform: 2× NVIDIA H200 NVL 141 GB with an NVLink bridge (282 GB HBM3e), two 5th-gen Intel Xeon CPUs and NVMe for the model store; the large model runs tensor-parallel across the GPU pair, the rest share the remaining memory.
Delivery
Test bench per the programme: drivers and CUDA, a GPU-enabled container runtime, vLLM deployment; models loaded from an offline repository; NVLink topology checks; load testing for tokens per second and time to first token at the target concurrency.
Outcome
The tender was won. The platform serves the whole model set at once with memory headroom for longer contexts, and a single GPU generation removed compatibility risk in operation.
06 · SRV03 certs

Server platforms

Compute platform architecture for virtualisation, databases, business applications and GPU workloads: from CPU and memory configuration to fleet deployment.

  • x86 platforms from leading vendors: 1–4 sockets, high-density and GPU servers
  • CPU selection by frequency and core count with software licensing in mind
  • Memory architecture: channels, ranks, NUMA; configurations for in-memory databases
  • Server storage: CPU-attached NVMe, software RAID, boot volumes
  • IBM Power: hybrid cloud, SAP HANA and Oracle, positioning for critical workloads
  • Management via BMC and Redfish, standard BIOS and firmware profiles, fleet deployment
  • Commissioning, diagnostics and fault resolution for server hardware

Backed by certifications

  • IBM · Power Solutions Sales Foundation
  • xFusion · FCIA — Server
  • xFusion · FCS-Solution — Server
CaseVideo analytics: 50 servers in one tender
Challenge
Supply a video analytics compute estate: 25 GPU servers, 4 application servers and 21 in-memory database servers, against a specification written for another vendor.
Architecture
GPU nodes on 2× AMD EPYC 9355 with 1152 GB RAM — every memory channel populated for bandwidth — and 8× NVIDIA L4 for video decode and analytics; 1U Intel Xeon 6 servers with balanced memory for the in-memory database. A compliance matrix in the customer’s format and a document justifying each deviation.
Delivery
Power, heat and rack placement for 50 servers; one baseline profile for BIOS, BMC and firmware; fleet configuration via Redfish; CPU, memory and GPU burn-in before go-live; integration with the video analytics software.
Outcome
The deviations were accepted as equivalent or better and the tender was won. All 50 servers went live on one configuration profile, simplifying support and node replacement.
07 · NET02 certs

Data networking

Data center and campus networks: resilient switching and routing, traffic segmentation, Ethernet storage networks.

  • Data center network design: leaf-spine, MLAG, LACP, VLAN segmentation
  • Switching: VLANs and 802.1Q trunks, STP and RSTP, EtherChannel
  • Routing: static and default routes, inter-VLAN routing, FHRP gateway redundancy
  • IPv4 and IPv6 addressing, DHCPv4, SLAAC and DHCPv6
  • LAN security: port security, DHCP snooping, segmentation
  • Ethernet storage networks: iSCSI, NVMe/TCP, jumbo frames, traffic isolation
  • Wireless networks: WLAN architecture and security

Backed by certifications

  • Cisco · CCNAv7: Introduction to Networks
  • Cisco · CCNAv7: Switching, Routing and Wireless Essentials
CaseHyperconverged cluster on zVirt and GlusterFS
Challenge
Replace proprietary virtualisation with a resilient three-node cluster (2× AMD EPYC, 256 GB, no hardware RAID) on zVirt 5.0 and GlusterFS with NVMe caching.
Architecture
Two switches in MLAG with LACP on every node; a VLAN plan separating GlusterFS (a dedicated jumbo-frame network), VM migration, management and user traffic; triple-replicated GlusterFS volumes with NVMe caching.
Delivery
A deployment runbook; during GlusterFS bring-up an MTU 9000 mismatch on switch ports was breaking replication — found with end-to-end MTU checks and fixed; failure tests: a node, a link and an entire switch.
Outcome
The cluster went into production: losing a node or a switch does not stop virtual machines. The runbook lets the customer replicate the design at other sites.
08 · DC03 certs

Data center facilities and cloud

Modular data centers, redundant cooling and power, environmental monitoring; cloud service and deployment models.

  • Modular data centers: hot and cold aisle containment, layout and scaling
  • Precision in-row and liquid cooling, thermal calculations, energy efficiency and PUE
  • Power: UPS topologies, N+1 and 2N redundancy, dual-feed racks
  • Facility monitoring and management systems
  • Cloud reference architecture: service and deployment models, service catalogue, orchestration
  • Availability, data protection and security of cloud infrastructure
  • Power, heat load and rack placement calculations

Backed by certifications

  • Huawei · HCSA-Presales-Data Center Facility (Cooling)
  • Huawei · HCSA-Sales-Data Center Facility
  • Dell · Cloud Infrastructure and Services
CaseModular data center for 36 racks
Challenge
Design the facility for a 36-rack server room with redundant cooling and power and capacity headroom for growth.
Architecture
Two cold-aisle-contained modules of 20 and 16 racks; 16 in-row precision coolers with N+1 redundancy; three 300 kVA modular UPS units in N+1; dual-feed racks; temperature, humidity, leak and smoke monitoring feeding the management system.
Delivery
Per-rack heat load and power calculations, floor plan, single-line diagram and coordination with the site power supply; integrated tests: switchover to batteries, cooler failure and automated emergency scenarios.
Outcome
N+1 cooling and power redundancy confirmed in testing, with a design PUE of 1.4 or better. The modular layout adds capacity without shutting the room down.

03

Approach

Five stages of technical ownership

  1. 01

    Discovery

    Interviews and questionnaires, review of the existing estate, requirements for performance, resilience, security and budget.

  2. 02

    Architecture and sizing

    Platform selection, workload-based resource sizing, comparison of vendor options by capability and total cost of ownership.

  3. 03

    Documentation

    Bill of materials, connectivity diagrams, architecture rationale, vendor-neutral specifications and compliance matrices.

  4. 04

    Solution defence

    Architecture presentations to engineers and executives, proofs of concept, responses to clarification requests.

  5. 05

    Delivery

    Supply and commissioning oversight, integration with the existing estate, as-built documentation and handover.

Deliverables

04

Projects

Selected from 100+ projects

AI · Project architect

On-prem AI infrastructure for GigaChat

Deployment of GigaChat 432B (MoE, 130k context) and a vision model inside the customer perimeter: HGX-class GPU servers and a 538-core application cluster.

3GPU servers
8×H200 141 GB each
24accelerators

Tender · Appliances

Specs for backup and SIEM appliances

Vendor-neutral specification with every line backed by official documentation. For the Kaspersky KUMA SIEM, requirements that the documentation did not support were corrected: memory mirroring, RAID controller interface, BMC features.

Audit · 149 items

Server and storage for a DWH

Bid validation against the specification with a documentation reference for every item. Found gaps: no FC HBA, 4 of 8 memory channels populated, no 24×7 support, encryption off despite SED drives, lead time too long.

Storage · 97 requirements

All-flash storage specification

Specification for storage with NVMe QLC modules and inline hardware compression: 97 requirements in 14 sections. Build: 10 × 13.2 TB modules, DRAID 6, 77 TB usable and 181 TB effective.

File storage · 200 TB

NFS for 100 million files

High-density RAID 60 store for a mixed Linux and Windows estate, a dedicated Veeam server and a tape library with two LTO-8 drives. Veeam licensing calculated with the distributor.

AI · Tender

Choosing accelerators for GPU servers

NVIDIA L40S vs RTX PRO 6000 Blackwell against a competing 30× L40S bid, with a comparison calculator. Review of H200 NVL builds: NVLink topology, vLLM deployment, NVMe layout.

AI · Air-gapped

RAG system sizing

Sizing calculator and document pack for an air-gapped customer running Hyper-V under a power budget.

05

Certifications

34 certifications · 8 vendors

IBM

07
  • AI-Enabled Infrastructure Practitioner Advanced
  • AI on Power Intermediate
  • Guardium Data Protection Practitioner Advanced
  • FlashSystem Technical Sales Intermediate
  • FlashSystem Sales Foundation
  • Power Solutions Sales Foundation
  • watsonx: Technical Essentials

Dell Technologies

08
  • Specialist — Technology Architect, Midrange Storage Solutions
  • Specialist — Implementation Engineer, VxRail
  • Specialist — Implementation Engineer, ECS
  • Specialist — Implementation Engineer, PowerProtect DD
  • Associate — Information Storage and Management
  • Associate — Cloud Infrastructure and Services
  • Associate — Data Protection and Management
  • Dell VxRail Deploy

Broadcom · Brocade

07
  • Brocade Certified Fabric Administrator
  • FCSAN-101 · Introduction to Fibre Channel SANs
  • HWG7D-121 · Gen 7 Director Hardware
  • HWG7S-122 · Gen 7 Switch Hardware
  • HWX6G7-120 · Upgrading X6 Director to Gen 7
  • MPOV-120 · SANnav Management Portal
  • WEBT-121 · Fabric OS Web Tools

VMware

03
  • vSphere: Install, Configure, Manage [V8]
  • vSAN: Plan and Deploy [V7]
  • VSP Foundation 2022

Huawei

04
  • HCIP-Storage
  • HCSA-Presales-Storage
  • HCSA-Presales-Data Center Facility (Cooling)
  • HCSA-Sales-Data Center Facility

Cisco

02
  • CCNAv7: Introduction to Networks
  • CCNAv7: Switching, Routing and Wireless Essentials

xFusion

02
  • FCIA — Server
  • FCS-Solution — Server

NVIDIA

01
  • InfiniBand Essentials

06 · Contact

Got infrastructure to build?

Solution architecture, tender preparation or an expert review of a specification. I reply within one business day.

Beslan Tsys · Presales Architect · Data center & AI infrastructure